STASNEY 4

STASNEY 4 is a Texas oil lease in Shackelford County, Railroad Commission district 7B, operated by Clear Fork, Incorporated. It has 1 wellbore on file with the Commission. Reported production runs from December 2003 to August 2026, totalling 171,710 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.7M, with roughly $269K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 199 barrels a month. Its strongest month on the record we hold was July 2016, at 494 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about STASNEY 4

Who operates STASNEY 4?
STASNEY 4 is operated by Clear Fork, Incorporated, Railroad Commission of Texas operator number 159500.
Where is STASNEY 4?
STASNEY 4 is a Texas oil lease in Shackelford County, Texas, in Railroad Commission district 7B. Its Railroad Commission lease number is 29342.
Is STASNEY 4 still producing?
STASNEY 4 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for STASNEY 4 is August 2026.
How much has STASNEY 4 produced?
STASNEY 4 has reported 171,710 barrels of oil (bbl) to the Railroad Commission of Texas between December 2003 and August 2026, from 1 wellbore.
How much is STASNEY 4 worth?
The remaining production from STASNEY 4 is estimated to be worth about $1.7M in total as of 27 August 2026, within a range of $1.4M to $2.1M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in STASNEY 4 is a fraction of it. The estimate fits an Arps decline curve to the production STASNEY 4 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for STASNEY 4 is an estimate of value, not an offer and not an appraisal.
How much income does STASNEY 4 generate in a year?
STASNEY 4 is forecast to net about $269K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in STASNEY 4 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

STASNEY 4 as filed with the Railroad Commission of Texas
OperatorClear Fork, Incorporated
FieldSheri (Caddo)
CountyShackelford County, Texas
RRC district7B
Lease number29342
Wellbores1
Reported production171,710 bbl
First reported
Last reported
Estimated royalty value$1.7M

Where STASNEY 4 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.