MCENTIRE 15

MCENTIRE 15 is a Texas gas lease in Sterling County, Railroad Commission district 08, operated by Atropos Production Corporation. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 187,939 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $11K, with roughly $1K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 61 thousand cubic feet a month. Its strongest month on the record we hold was May 2016, at 249 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about MCENTIRE 15

Who operates MCENTIRE 15?
MCENTIRE 15 is operated by Atropos Production Corporation, Railroad Commission of Texas operator number 036617.
Where is MCENTIRE 15?
MCENTIRE 15 is a Texas gas lease in Sterling County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 074617.
Is MCENTIRE 15 still producing?
MCENTIRE 15 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for MCENTIRE 15 is August 2026.
How much has MCENTIRE 15 produced?
MCENTIRE 15 has reported 187,939 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between January 1993 and August 2026, from 1 wellbore.
How much is MCENTIRE 15 worth?
The remaining production from MCENTIRE 15 is estimated to be worth about $11K in total as of 27 August 2026, within a range of $6K to $16K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in MCENTIRE 15 is a fraction of it. The estimate fits an Arps decline curve to the production MCENTIRE 15 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for MCENTIRE 15 is an estimate of value, not an offer and not an appraisal.
How much income does MCENTIRE 15 generate in a year?
MCENTIRE 15 is forecast to net about $1K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in MCENTIRE 15 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

MCENTIRE 15 as filed with the Railroad Commission of Texas
OperatorAtropos Production Corporation
FieldCredo, E. (Cisco, Up.)
CountySterling County, Texas
RRC district08
Lease number074617
Wellbores1
Reported production187,939 mcf
First reported
Last reported
Estimated royalty value$11K

Where MCENTIRE 15 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.