STEWART -CD-

STEWART -CD- is a Texas oil lease in Sterling County, Railroad Commission district 08, operated by Enex Resources Corporation. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 21,477 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $289K, with roughly $56K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 52 barrels a month. Its strongest month on the record we hold was January 2022, at 371 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about STEWART -CD-

Who operates STEWART -CD-?
STEWART -CD- is operated by Enex Resources Corporation, Railroad Commission of Texas operator number 252124.
Where is STEWART -CD-?
STEWART -CD- is a Texas oil lease in Sterling County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 33029.
Is STEWART -CD- still producing?
STEWART -CD- is currently producing. The most recent month of production reported to the Railroad Commission of Texas for STEWART -CD- is August 2026.
How much has STEWART -CD- produced?
STEWART -CD- has reported 21,477 barrels of oil (bbl) to the Railroad Commission of Texas between January 1993 and August 2026, from 1 wellbore.
How much is STEWART -CD- worth?
The remaining production from STEWART -CD- is estimated to be worth about $289K in total as of 26 August 2026, within a range of $159K to $419K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in STEWART -CD- is a fraction of it. The estimate fits an Arps decline curve to the production STEWART -CD- has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for STEWART -CD- is an estimate of value, not an offer and not an appraisal.
How much income does STEWART -CD- generate in a year?
STEWART -CD- is forecast to net about $56K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in STEWART -CD- receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

STEWART -CD- as filed with the Railroad Commission of Texas
OperatorEnex Resources Corporation
FieldCredo (Wolfcamp)
CountySterling County, Texas
RRC district08
Lease number33029
Wellbores1
Reported production21,477 bbl
First reported
Last reported
Estimated royalty value$289K

Where STEWART -CD- sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.