REED 100
REED 100 is a Texas gas lease in Sutton County, Railroad Commission district 7C, operated by American Exploration Company. It has 1 wellbore on file with the Commission. Reported production runs from November 1993 to August 2026, totalling 586,017 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $15K, with roughly $2K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 90 thousand cubic feet a month. Its strongest month on the record we hold was August 2017, at 149 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about REED 100
- Who operates REED 100?
- REED 100 is operated by American Exploration Company, Railroad Commission of Texas operator number 018023.
- Where is REED 100?
- REED 100 is a Texas gas lease in Sutton County, Texas, in Railroad Commission district 7C. Its Railroad Commission lease number is 147649.
- Is REED 100 still producing?
- REED 100 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for REED 100 is August 2026.
- How much has REED 100 produced?
- REED 100 has reported 586,017 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between November 1993 and August 2026, from 1 wellbore.
- How much is REED 100 worth?
- The remaining production from REED 100 is estimated to be worth about $15K in total as of 26 August 2026, within a range of $8K to $21K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in REED 100 is a fraction of it. The estimate fits an Arps decline curve to the production REED 100 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for REED 100 is an estimate of value, not an offer and not an appraisal.
- How much income does REED 100 generate in a year?
- REED 100 is forecast to net about $2K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in REED 100 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | American Exploration Company |
|---|---|
| Field | Sawyer (Canyon) |
| County | Sutton County, Texas |
| RRC district | 7C |
| Lease number | 147649 |
| Wellbores | 1 |
| Reported production | 586,017 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $15K |
Where REED 100 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.