BANDIT-WEST WN III

BANDIT-WEST WN III is a Texas oil lease in Upton County, Railroad Commission district 7C, operated by Headington Energy Partners, LLC. It has 1 wellbore on file with the Commission. Reported production runs from September 2020 to August 2026, totalling 236,764 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $461K, with roughly $289K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 385 barrels a month. Its strongest month on the record we hold was November 2020, at 17,027 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about BANDIT-WEST WN III

Who operates BANDIT-WEST WN III?
BANDIT-WEST WN III is operated by Headington Energy Partners, LLC, Railroad Commission of Texas operator number 370061.
Where is BANDIT-WEST WN III?
BANDIT-WEST WN III is a Texas oil lease in Upton County, Texas, in Railroad Commission district 7C. Its Railroad Commission lease number is 21155.
Is BANDIT-WEST WN III still producing?
BANDIT-WEST WN III is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BANDIT-WEST WN III is August 2026.
How much has BANDIT-WEST WN III produced?
BANDIT-WEST WN III has reported 236,764 barrels of oil (bbl) to the Railroad Commission of Texas between September 2020 and August 2026, from 1 wellbore.
How much is BANDIT-WEST WN III worth?
The remaining production from BANDIT-WEST WN III is estimated to be worth about $461K in total as of 27 August 2026, within a range of $360K to $562K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BANDIT-WEST WN III is a fraction of it. The estimate fits an Arps decline curve to the production BANDIT-WEST WN III has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BANDIT-WEST WN III is an estimate of value, not an offer and not an appraisal.
How much income does BANDIT-WEST WN III generate in a year?
BANDIT-WEST WN III is forecast to net about $289K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in BANDIT-WEST WN III receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

BANDIT-WEST WN III as filed with the Railroad Commission of Texas
OperatorHeadington Energy Partners, LLC
FieldSpraberry (Trend Area) R 40 Exc
CountyUpton County, Texas
RRC district7C
Lease number21155
Wellbores1
Reported production236,764 bbl
First reported
Last reported
Estimated royalty value$461K

Where BANDIT-WEST WN III sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.