LIMBER PINE A2
LIMBER PINE A2 is a Texas oil lease in Ward County, Railroad Commission district 08, operated by Callon Petroleum Operating Co. It has 1 wellbore on file with the Commission. Reported production runs from December 2018 to August 2026, totalling 347,473 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $2.4M, with roughly $456K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 743 barrels a month. Its strongest month on the record we hold was December 2018, at 31,510 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about LIMBER PINE A2
- Who operates LIMBER PINE A2?
- LIMBER PINE A2 is operated by Callon Petroleum Operating Co, Railroad Commission of Texas operator number 124828.
- Where is LIMBER PINE A2?
- LIMBER PINE A2 is a Texas oil lease in Ward County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 51802.
- Is LIMBER PINE A2 still producing?
- LIMBER PINE A2 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for LIMBER PINE A2 is August 2026.
- How much has LIMBER PINE A2 produced?
- LIMBER PINE A2 has reported 347,473 barrels of oil (bbl) to the Railroad Commission of Texas between December 2018 and August 2026, from 1 wellbore.
- How much is LIMBER PINE A2 worth?
- The remaining production from LIMBER PINE A2 is estimated to be worth about $2.4M in total as of 26 August 2026, within a range of $1.9M to $3.0M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in LIMBER PINE A2 is a fraction of it. The estimate fits an Arps decline curve to the production LIMBER PINE A2 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for LIMBER PINE A2 is an estimate of value, not an offer and not an appraisal.
- How much income does LIMBER PINE A2 generate in a year?
- LIMBER PINE A2 is forecast to net about $456K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in LIMBER PINE A2 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Callon Petroleum Operating Co |
|---|---|
| Field | Phantom (Wolfcamp) |
| County | Ward County, Texas |
| RRC district | 08 |
| Lease number | 51802 |
| Wellbores | 1 |
| Reported production | 347,473 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $2.4M |
Where LIMBER PINE A2 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.