LIMBER PINE A7
LIMBER PINE A7 is a Texas oil lease in Ward County, Railroad Commission district 08, operated by Callon Petroleum Operating Co. It has 1 wellbore on file with the Commission. Reported production runs from April 2021 to August 2026, totalling 333,213 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.2M, with roughly $479K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 2,124 barrels a month. Its strongest month on the record we hold was May 2021, at 21,634 barrels. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about LIMBER PINE A7
- Who operates LIMBER PINE A7?
- LIMBER PINE A7 is operated by Callon Petroleum Operating Co, Railroad Commission of Texas operator number 124828.
- Where is LIMBER PINE A7?
- LIMBER PINE A7 is a Texas oil lease in Ward County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 56392.
- Is LIMBER PINE A7 still producing?
- LIMBER PINE A7 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for LIMBER PINE A7 is August 2026.
- How much has LIMBER PINE A7 produced?
- LIMBER PINE A7 has reported 333,213 barrels of oil (bbl) to the Railroad Commission of Texas between April 2021 and August 2026, from 1 wellbore.
- How much is LIMBER PINE A7 worth?
- The remaining production from LIMBER PINE A7 is estimated to be worth about $1.2M in total as of 26 August 2026, within a range of $956K to $1.3M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in LIMBER PINE A7 is a fraction of it. The estimate fits an Arps decline curve to the production LIMBER PINE A7 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for LIMBER PINE A7 is an estimate of value, not an offer and not an appraisal.
- How much income does LIMBER PINE A7 generate in a year?
- LIMBER PINE A7 is forecast to net about $479K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in LIMBER PINE A7 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Callon Petroleum Operating Co |
|---|---|
| Field | Phantom (Wolfcamp) |
| County | Ward County, Texas |
| RRC district | 08 |
| Lease number | 56392 |
| Wellbores | 1 |
| Reported production | 333,213 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $1.2M |
Where LIMBER PINE A7 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.