UTL 1308I
UTL 1308I is a Texas oil lease in Ward County, Railroad Commission district 08, operated by Jagged Peak Energy LLC. It has 1 wellbore on file with the Commission. Reported production runs from October 2021 to August 2026, totalling 282,759 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $669K, with roughly $124K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 467 barrels a month. Its strongest month on the record we hold was March 2022, at 33,531 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about UTL 1308I
- Who operates UTL 1308I?
- UTL 1308I is operated by Jagged Peak Energy LLC, Railroad Commission of Texas operator number 429574.
- Where is UTL 1308I?
- UTL 1308I is a Texas oil lease in Ward County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 56432.
- Is UTL 1308I still producing?
- UTL 1308I is currently producing. The most recent month of production reported to the Railroad Commission of Texas for UTL 1308I is August 2026.
- How much has UTL 1308I produced?
- UTL 1308I has reported 282,759 barrels of oil (bbl) to the Railroad Commission of Texas between October 2021 and August 2026, from 1 wellbore.
- How much is UTL 1308I worth?
- The remaining production from UTL 1308I is estimated to be worth about $669K in total as of 27 August 2026, within a range of $522K to $816K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in UTL 1308I is a fraction of it. The estimate fits an Arps decline curve to the production UTL 1308I has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for UTL 1308I is an estimate of value, not an offer and not an appraisal.
- How much income does UTL 1308I generate in a year?
- UTL 1308I is forecast to net about $124K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in UTL 1308I receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Jagged Peak Energy LLC |
|---|---|
| Field | Phantom (Wolfcamp) |
| County | Ward County, Texas |
| RRC district | 08 |
| Lease number | 56432 |
| Wellbores | 1 |
| Reported production | 282,759 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $669K |
Where UTL 1308I sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.