WHISKEY RIVER 9596A-34

WHISKEY RIVER 9596A-34 is a Texas oil lease in Ward County, Railroad Commission district 08, operated by Jagged Peak Energy LLC. It has 3 wellbores on file with the Commission. Reported production runs from July 2018 to August 2026, totalling 1,307,268 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $22.8M, with roughly $6.1M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 8,932 barrels a month, about 2,977 per wellbore. Its strongest month on the record we hold was August 2019, at 42,226 barrels. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about WHISKEY RIVER 9596A-34

Who operates WHISKEY RIVER 9596A-34?
WHISKEY RIVER 9596A-34 is operated by Jagged Peak Energy LLC, Railroad Commission of Texas operator number 429574.
Where is WHISKEY RIVER 9596A-34?
WHISKEY RIVER 9596A-34 is a Texas oil lease in Ward County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 50849.
Is WHISKEY RIVER 9596A-34 still producing?
WHISKEY RIVER 9596A-34 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for WHISKEY RIVER 9596A-34 is August 2026.
How much has WHISKEY RIVER 9596A-34 produced?
WHISKEY RIVER 9596A-34 has reported 1,307,268 barrels of oil (bbl) to the Railroad Commission of Texas between July 2018 and August 2026, from 3 wellbores.
How much is WHISKEY RIVER 9596A-34 worth?
The remaining production from WHISKEY RIVER 9596A-34 is estimated to be worth about $22.8M in total as of 27 August 2026, within a range of $18.9M to $26.7M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in WHISKEY RIVER 9596A-34 is a fraction of it. The estimate fits an Arps decline curve to the production WHISKEY RIVER 9596A-34 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for WHISKEY RIVER 9596A-34 is an estimate of value, not an offer and not an appraisal.
How much income does WHISKEY RIVER 9596A-34 generate in a year?
WHISKEY RIVER 9596A-34 is forecast to net about $6.1M across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in WHISKEY RIVER 9596A-34 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

WHISKEY RIVER 9596A-34 as filed with the Railroad Commission of Texas
OperatorJagged Peak Energy LLC
FieldPhantom (Wolfcamp)
CountyWard County, Texas
RRC district08
Lease number50849
Wellbores3
Reported production1,307,268 bbl
First reported
Last reported
Estimated royalty value$22.8M

Where WHISKEY RIVER 9596A-34 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.