DAVIS 65

DAVIS 65 is a Texas gas lease in Wheeler County, Railroad Commission district 10, operated by Chesapeake Operating, Inc. It has 1 wellbore on file with the Commission. Reported production runs from January 2013 to August 2026, totalling 1,383,042 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $744K, with roughly $145K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 3,602 thousand cubic feet a month. Its strongest month on the record we hold was May 2018, at 13,732 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about DAVIS 65

Who operates DAVIS 65?
DAVIS 65 is operated by Chesapeake Operating, Inc., Railroad Commission of Texas operator number 147715.
Where is DAVIS 65?
DAVIS 65 is a Texas gas lease in Wheeler County, Texas, in Railroad Commission district 10. Its Railroad Commission lease number is 269429.
Is DAVIS 65 still producing?
DAVIS 65 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for DAVIS 65 is August 2026.
How much has DAVIS 65 produced?
DAVIS 65 has reported 1,383,042 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between January 2013 and August 2026, from 1 wellbore.
How much is DAVIS 65 worth?
The remaining production from DAVIS 65 is estimated to be worth about $744K in total as of 26 August 2026, within a range of $617K to $870K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in DAVIS 65 is a fraction of it. The estimate fits an Arps decline curve to the production DAVIS 65 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for DAVIS 65 is an estimate of value, not an offer and not an appraisal.
How much income does DAVIS 65 generate in a year?
DAVIS 65 is forecast to net about $145K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in DAVIS 65 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

DAVIS 65 as filed with the Railroad Commission of Texas
OperatorChesapeake Operating, Inc.
FieldMills Ranch (Granite Wash Cons.)
CountyWheeler County, Texas
RRC district10
Lease number269429
Wellbores1
Reported production1,383,042 mcf
First reported
Last reported
Estimated royalty value$744K

Where DAVIS 65 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.