WALKER SMITH

WALKER SMITH is a Texas oil lease in Wilbarger County, Railroad Commission district 09, operated by Energy Management Company. It has 24 wellbores on file with the Commission. Reported production runs from August 2013 to August 2026, totalling 70,553 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $267K, with roughly $51K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 37 barrels a month, about 2 per wellbore. Its strongest month on the record we hold was May 2016, at 973 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about WALKER SMITH

Who operates WALKER SMITH?
WALKER SMITH is operated by Energy Management Company, Railroad Commission of Texas operator number 251770.
Where is WALKER SMITH?
WALKER SMITH is a Texas oil lease in Wilbarger County, Texas, in Railroad Commission district 09. Its Railroad Commission lease number is 32584.
Is WALKER SMITH still producing?
WALKER SMITH is currently producing. The most recent month of production reported to the Railroad Commission of Texas for WALKER SMITH is August 2026.
How much has WALKER SMITH produced?
WALKER SMITH has reported 70,553 barrels of oil (bbl) to the Railroad Commission of Texas between August 2013 and August 2026, from 24 wellbores.
How much is WALKER SMITH worth?
The remaining production from WALKER SMITH is estimated to be worth about $267K in total as of 26 August 2026, within a range of $147K to $387K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in WALKER SMITH is a fraction of it. The estimate fits an Arps decline curve to the production WALKER SMITH has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for WALKER SMITH is an estimate of value, not an offer and not an appraisal.
How much income does WALKER SMITH generate in a year?
WALKER SMITH is forecast to net about $51K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in WALKER SMITH receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

WALKER SMITH as filed with the Railroad Commission of Texas
OperatorEnergy Management Company
FieldKing, North (1600 Sand)
CountyWilbarger County, Texas
RRC district09
Lease number32584
Wellbores24
Reported production70,553 bbl
First reported
Last reported
Estimated royalty value$267K

Where WALKER SMITH sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.