SALLYN-WHITAKER
SALLYN-WHITAKER is a Texas oil lease in Young County, Railroad Commission district 09, operated by Hays, Boydston & Moore. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 27,452 barrels. The lease is intermittent. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $106K, with roughly $20K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 13 barrels a month. Its strongest month on the record we hold was November 2016, at 165 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about SALLYN-WHITAKER
- Who operates SALLYN-WHITAKER?
- SALLYN-WHITAKER is operated by Hays, Boydston & Moore, Railroad Commission of Texas operator number 369072.
- Where is SALLYN-WHITAKER?
- SALLYN-WHITAKER is a Texas oil lease in Young County, Texas, in Railroad Commission district 09. Its Railroad Commission lease number is 22277.
- Is SALLYN-WHITAKER still producing?
- SALLYN-WHITAKER is intermittent. The most recent month of production reported to the Railroad Commission of Texas for SALLYN-WHITAKER is August 2026.
- How much has SALLYN-WHITAKER produced?
- SALLYN-WHITAKER has reported 27,452 barrels of oil (bbl) to the Railroad Commission of Texas between January 1993 and August 2026, from 1 wellbore.
- How much is SALLYN-WHITAKER worth?
- The remaining production from SALLYN-WHITAKER is estimated to be worth about $106K in total as of 26 August 2026, within a range of $58K to $153K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in SALLYN-WHITAKER is a fraction of it. The estimate fits an Arps decline curve to the production SALLYN-WHITAKER has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for SALLYN-WHITAKER is an estimate of value, not an offer and not an appraisal.
- How much income does SALLYN-WHITAKER generate in a year?
- SALLYN-WHITAKER is forecast to net about $20K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in SALLYN-WHITAKER receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Hays, Boydston & Moore |
|---|---|
| Field | Langston-Kleiner (Strawn) |
| County | Young County, Texas |
| RRC district | 09 |
| Lease number | 22277 |
| Wellbores | 1 |
| Reported production | 27,452 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $106K |
Where SALLYN-WHITAKER sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.