ARACELI
ARACELI is a Texas gas lease in Zapata County, Railroad Commission district 04, operated by Transamerican Natural Gas Corp. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 3,339,509 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $381K, with roughly $58K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 2,573 thousand cubic feet a month. Its strongest month on the record we hold was June 2016, at 5,018 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about ARACELI
- Who operates ARACELI?
- ARACELI is operated by Transamerican Natural Gas Corp., Railroad Commission of Texas operator number 864424.
- Where is ARACELI?
- ARACELI is a Texas gas lease in Zapata County, Texas, in Railroad Commission district 04. Its Railroad Commission lease number is 130333.
- Is ARACELI still producing?
- ARACELI is currently producing. The most recent month of production reported to the Railroad Commission of Texas for ARACELI is August 2026.
- How much has ARACELI produced?
- ARACELI has reported 3,339,509 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between January 1993 and August 2026, from 1 wellbore.
- How much is ARACELI worth?
- The remaining production from ARACELI is estimated to be worth about $381K in total as of 26 August 2026, within a range of $316K to $445K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in ARACELI is a fraction of it. The estimate fits an Arps decline curve to the production ARACELI has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for ARACELI is an estimate of value, not an offer and not an appraisal.
- How much income does ARACELI generate in a year?
- ARACELI is forecast to net about $58K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in ARACELI receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Transamerican Natural Gas Corp. |
|---|---|
| Field | El Huerfano (10800) |
| County | Zapata County, Texas |
| RRC district | 04 |
| Lease number | 130333 |
| Wellbores | 1 |
| Reported production | 3,339,509 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $381K |
Where ARACELI sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.