PALMYRA
PALMYRA is a Texas gas lease in Zapata County, Railroad Commission district 04, operated by Transtexas Gas Corporation. It has 1 wellbore on file with the Commission. Reported production runs from September 1995 to August 2026, totalling 3,598,968 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $22K, with roughly $9K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 854 thousand cubic feet a month. Its strongest month on the record we hold was October 2016, at 3,528 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about PALMYRA
- Who operates PALMYRA?
- PALMYRA is operated by Transtexas Gas Corporation, Railroad Commission of Texas operator number 864889.
- Where is PALMYRA?
- PALMYRA is a Texas gas lease in Zapata County, Texas, in Railroad Commission district 04. Its Railroad Commission lease number is 156991.
- Is PALMYRA still producing?
- PALMYRA is currently producing. The most recent month of production reported to the Railroad Commission of Texas for PALMYRA is August 2026.
- How much has PALMYRA produced?
- PALMYRA has reported 3,598,968 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between September 1995 and August 2026, from 1 wellbore.
- How much is PALMYRA worth?
- The remaining production from PALMYRA is estimated to be worth about $22K in total as of 27 August 2026, within a range of $17K to $26K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in PALMYRA is a fraction of it. The estimate fits an Arps decline curve to the production PALMYRA has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for PALMYRA is an estimate of value, not an offer and not an appraisal.
- How much income does PALMYRA generate in a year?
- PALMYRA is forecast to net about $9K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in PALMYRA receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Transtexas Gas Corporation |
|---|---|
| Field | Bob West, North (L2, L3) |
| County | Zapata County, Texas |
| RRC district | 04 |
| Lease number | 156991 |
| Wellbores | 1 |
| Reported production | 3,598,968 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $22K |
Where PALMYRA sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.